CM Pak Limited Pakistan (Zong Projects)

Description Total Project Value
Supply, installation & commissioning of 30 KVA Line Conditioners nationwide along with 35mm2 4 core power cable. nationwide (500 sites) 24,481,607.00
Supply, installation & commissioning of DG Set Intelligent Module nationwide (283 sites) 2,767,013.00
Supply, installation & commissioning of Rectifier Battery Bank (256 sites) 1,203,200.00
Supply & automation of 500/1000 liters fuel tanks along with foundation pad  (73 sites) 861,442.00
RCC foundation pad for fuel tanks (61sites) 338,400.00
Supply, installation & commissioning of ABB/MCCB 4P 100Amp Breakers (31 sites) 395,625.87
Supply, installation & commissioning of Auto Transfer Switch (ATS Panel)  for 16 KVA, 20 KVA, 22 KVA & 30 KVA DG Set (30 Sites) 1,482,000.00
Supply, installation & commissioning of 50 KVA Line Conditioners nationwide along with 35mm2 4 core power cable. (1 site) 166,116.00
Supply, laying & termination of power cable 35mm 4 core (380 meter) 680,595.20
Dismantling, loading, transportation, unloading & installation of DG Set (2 sites) 253,800.00
Construction of Foundation pad & Retaining walls (9 Sites) 1,754,284.00


Pakistan Telecom Mobile Limited (Ufone Projects)

Description Total Project Value
Supply, transportation & automation of 500 liters fuel tanks nationwide along with construction of foundation pad nationwide (181 Sites) 14,359,100.00
Supply, transportation & installation of 27 KVA DG Set trolleys along with power cable. (6 Sites) 1,251,000.00


Huawei Technologies Pakistan (PVT) Limited (Ufone) Projects

Description Total Project Value
Supply, installation & commissioning of DG Set Intelligent Module  for Outdoor/Indoor Sites  nationwide (3100 Sites) 29,746,000.00
Supply, transportation, installation & commissioning of 1000 KVA Phase Sequence Changer (3 Sites) 3,606,856.00
Supply, transportation & automation of 500 liters fuel tanks nationwide (180 Sites) 10,130,400.00
Supply, transportation & automation of 8000/12000 liters fuel tanks nationwide (17 Sites) 9,689,306.00
Supply, transportation, installation & commissioning of Motion Sensor & Energy Savers nationwide (17 Sites) 11,873,380.00


Pakistan
Telecommunication Company Limited (PTCL Project)

Description Total Project Value
Supply, transportation & automation of 500/1000/1500/2000/4000 liters fuel tanks along with construction of foundation pad (47 Sites) 3,364,968.00


Warid Telecom (Pvt) Limited Pakistan Project

Description Total Project Value
Supply, installation & commissioning of VTDC  Module  for Outdoor/Indoor Sites  nationwide (100 Sites) 950,000.00


Micronutrient (Pvt) Limited Islamabad

Description Total Project Value
Annual Maintenance of DG Set 30,000.00


PWD Maintenance Division Muzaffarbad Projects

Description Total Project Value
Supply, installation & commissioning of 20 KVA DG Set along with power cable,  ATS  Panel & sound proof, weather proof canopy (1 Sites) 9,66,900.00
Supply, Installation & commissioning of 200 KVA DG Set along with power cable, ATS/AMF Panel & sound proof, weather proof canopy (1 Site) 5,265,760.00
Supply, Installation & commissioning of 300 KVA DG Set along with power cable,  ATS/AMF Panel & sound proof, weather proof canopy (1 Site) 6,209,800.00


Stock Exchange Islamabad Project

Description Total Project Value
Supply, installation & commissioning of 350 KVA DG Set along with power cable ATS/AMF Panel, 2000 liters fuel tanks & sound proof, weather proof canopy (1 Sites) 6,298,000.00


Murshid Builders (Pvt) Limited Project

Description Total Project Value
Supply, installation, testing & commissioning of Street Lights Poles (35 feet high)  on 4 Kilo Meters perimeter walls along with Philips (SGX 186 lights). In addition, supply and installation of transformer, HT cable laying, designing and implementation of complete power system including integration with generators at Terbela Ghazi SSG Headquarters    8,662,746.00
Supply, installation, testing and commissioning of 150 kVA  and 100 kVA Automatic Voltage Regulators alongwith Power Factor Improvement Plant, Star-Delta Panel, LT Panel  etc on 3 water pumping stations at Cherat SSG Headquarters 4,627,266.00
Overhauling of Generator of 135 kVA Generator at Terbla Ghazi 533,000.

Karcon (Pvt) Limited Project

Description Total Project Value
Supply, transportation & Installation of Synchronization Panel for 02 x generators at Kohat Tunnel 1,800,000.00


National Highway Authority, Kohat Tunnel Lighting Project

Description Total Project Value
Provision of emergency lighting system in Kohat Tunnel after explosion on 28 Jan 2011 1,600,000.00


UNHCR Peshawar

Description Total Project Value
Installation, testing & commissioning of 04 Nos. DG Set at different location in Peshawar region. 900,000.00


Allied Engineering & Services Projects

Description Total Project Value
Supply, installation & commissioning of ATS/AMF Panels for 30 KVA/20 KVA DG Set (54 sites Zong Project) 3,689,000.00
Supply, installation & commissioning  of Dual ATS/AMF Panel along with transportation, installation, testing, commissioning of  50 KVA DG Set, Supply, laying , termination of power cable, construction of foundation pad & earth system (12 Sites Telenor Project) 3,623,000.00
Supply, installation & commissioning  of Dual ATS/AMF Panel along with transportation, installation, testing, commissioning of  65 KVA DG Set, Supply, laying , termination of power cable, construction of foundation pad & earth system (4 Sites Telenor Project) 916,000.00
Transportation, installation & commissioning of DG Set 22 KVA/ 30KVA DG Set nationwide. (59 Sites Zong Project) 2.705,000.00
Supply, installation & commissioning  of ATS/AMF Panel along with transportation, installation, testing, commissioning of  13.5 KVA DG Set, Supply, laying , termination of power cable, 500 liters fuel filling ( 115 Sites Telenor Project) 12,854,500.00
Supply, installation & commissioning of ATS/AMF Panels along with transportation, installation, testing, commissioning of  22 KVA DG Set. (6 Sites Telenor Project) 666,000.00
Transportation, installation & commissioning of 50 KVA DG Set along with power cable, construction of foundation pad & earth system nationwide. (21 Sites NLC Project) 2,100,000.00


Allied Engineering & Services Misllieneus Projects

Description Total Project Value
Supply, installation & fixing of Sound Attenuated canopy which can reduce sound level for 44 KVA DG Set (2 Site) 150,000.00
Supply, installation of ATS/AMF panel, along with transportation, installation, testing, commissioning, of 22 KVA/30 KVA DG Set, supply, laying, termination of power cable, fixing of sound proof canopy, construction of foundation pad & earthing system (2 Site) 322,500.00
Supply, installation & commissioning of ATS/AMF panel along with, supply, laying, termination of power cable, transportation, installation, testing, commissioning, of 100 KVA DG Set construction of foundation pad & earthing system (1 Site) 189,250.00
Supply, transportation, installation & commissioning of ATS/AMF/MOR along with power cable (1Site) 140,000.00
 Supply, installation & commissioning of ATS/AMF panel along with, supply, laying, termination of power cable, transportation, installation, testing, commissioning, of 65 KVA DG Set construction of foundation pad & earthing system (2Site) 223,100.00
Supply, installation, testing & commissioning of ATS/AMF panel for 220 KVA DG Set along with supply, laying & termination of  power cable, construction of foundation pad & earthing system (1Site) 300,800.00
Supply, installation, testing & commissioning of ATS/AMF panel for 110 KVA DG (1 Site) 70,000.00
Transportation, installation, testing, commissioning, of 35 KVA DG Set along with fixing of sound proof canopy, construction of foundation pad & earthing system (2 Site) 110,000.00
Supply, installation & commissioning of ATS/AMF panel along with, supply, laying, termination of power cable, transportation, installation, testing, commissioning, of 44 KVA DG Set, construction of foundation pad & earthing system (2Site) 263,800.00


Pakistan Mobile Communication Limited (Mobilink)

Description Total Project Value
Supply & Automation of 1000 liters fuel tanks (1124, 1000 liters fuel tanks)

Supply & automation of 2000 liters fuel tanks (525, 2000 liters fuel tanks)

Supply & installation & commissioning of Dual ATS panel (60 dual ATS panel)

along with transportation, installation, commissioning of DG Set, ATS Panel, dual ATS panel laying & termination of power cable at green field rooftop & hill top sites. (Site 353 )

54,915,920.00
Loading, transportation, unloading, installation, commissioning of DG Set along with 320 meters power cable at green field, rooftop & hill top sites. (884 Sites) 22,995,000.00
Supply, installation & commissioning of ATS/AMF Panel (500 ATS Panels)

along with installation, commissioning of DG Set, (286 Sites)

26,050,000.00
Supply, installation & fixing of DG Set Canopies (33 Sites) 3,348,000.00


MAJOR PROJECTS (CIVIL)

Mobiserve Pakistan (Pvt) Limited Islamabad

Description Total Project Value
46 meter high green filed site, Raft Foundation (8 Sites) 15,924,242.00
37 meter high green filed site, Raft Foundation (2 Sites) 2,645,180.00
61  meter high green filed site, Raft Foundation (2 Sites) 3,840,049.98
25  meter high green filed site, Raft Foundation (1 Sites) 975,000.00
Construction of  Foundation Pad (1 Site) 100,000.00


Globe Com (Pvt) Limited Islamabad

Description Total Project Value
46 meter high green filed site, Raft Foundation (8 Sites) 11,752,650.00
37 meter high green filed site, Raft Foundation (1 Sites) 1,125,000.00
30  meter high green filed site, Raft Foundation (2 Sites) 2,414,330.00
25  meter high green filed site, Raft Foundation (1 Sites) 940,700.00